THE SALTY DOG CREW WILL KEEP YOU UPDATED THROUGHOUT THE PROJECT

June 2017

 

May 2017

The front af the 5,5 ton mama - now named Bertha

The front af the 5,5 ton mama - now named Bertha

 

April 2017

Sliding cover in Oak and Accoya

Sliding cover in Oak and Accoya

Organic Auro oil and wax from okomaling.dk

Organic Auro oil and wax from okomaling.dk

March 2017

The Flotel in its right element...Thanx to 3D designer Martin Brinks for the model

The Flotel in its right element...Thanx to 3D designer Martin Brinks for the model

All hands on deck - specially if it´s Thermo Pine from keflico.com

All hands on deck - specially if it´s Thermo Pine from keflico.com

Thanks to Erik "The Claywizard" Dauer for the beautiful result

Thanks to Erik "The Claywizard" Dauer for the beautiful result

The clay plastered walls are slowly drying up

The clay plastered walls are slowly drying up

Room with a view

Room with a view

February 2017

The portside of the Flotel is all covered with Accoya planks from keflico.com

The portside of the Flotel is all covered with Accoya planks from keflico.com

Flotel aft

The Flotel seen from the aft

 

January 2017

A sample of thin plastered clay with the coolest name - Nantucket Sand - from americanclay.com

A sample of thin plastered clay with the coolest name - Nantucket Sand - from americanclay.com

Built-in marinecables in Fermacell H20 Powerwalls - fermacell.com

Built-in marinecables in Fermacell H20 Powerwalls - fermacell.com

An odd looking thing - with roof/deck and the sides covered up

An odd looking thing - with roof/deck and the sides covered up

Happy new year. Thanks to Bjørg and Johan for throwing a topping-out ceremony on new years eve.

Happy new year. Thanks to Bjørg and Johan for throwing a topping-out ceremony on new years eve.

 

December 2016

Fitting the joints for the supporting structure. The larch wood will be coated with Burnblock before it is fitted onboard.

Fitting the joints for the supporting structure. The larch wood will be coated with Burnblock before it is fitted onboard.

 

November 2016

Thumbs up for the final result after de-molding.

Thumbs up for the final result after de-molding.

November 2016

The lower hull is now packed with 120 mm insulation

The lower hull is now packed with 120 mm insulation

November 2016  

Pictures from the making of the hull will be uploaded soon.     Big thanks to Carsten Nørgaard, Erik Dauer, Rasmus and Johan for helping me out through "The Mayhem of concrete"

 

October 2016 

Welcome onboard. We have just received some high-end samples from our new sponsorpartner KEFLICO. We´re looking forward to work with keflico.com

 

September 2016 

The most trusted member of The Salty Dog Crew, my son Johan, has completed the weldings for the hulls inner frame.

 

September 2016 

Toolbox meeting with Sales Consultant, Erling Johansen, from the concrete company - kroghs-as.dk

 

August 2016 

Presentation of the project at The Ærø Visions Event at Det Gamle Værft(The Old Yard) in Ærøskøbing

 

August 2016 

Completion of the mold for the hull and deck (right)

Form.jpg

 

August 2016 

Launch of the offgridflotel.com

 

July 2016 

The final design of the Flotel's hull, doghouse and interior

 

May 2016

Article in the newspaper Fyens, May 26th

March 2016 

Calculations on battery capacity for the solarpanels. Dimensions for watertank,  heating system and electricity

 

Januar 2016

  Worldwide research for re- and upcycled as well as saltwater-resistent materials and FSC-certified wood

 

October 2015 

Consultation with Danish Maritime Authority and Danish Coastal Authority on setting up a maritime business

 

September 2015 

Is it possible to built an offgrid flotel?